您当前的位置:
首页 >
文章列表页 >
Feasibility Study on the Strategy of Time Division Switching off Sub-bank Filter in ±800 kV Pu’er Converter Station Isolated Island
更新时间:2025-04-26
    • Feasibility Study on the Strategy of Time Division Switching off Sub-bank Filter in ±800 kV Pu’er Converter Station Isolated Island

    • High VoltageApparatus   Vol. 53, Issue 5, Pages: 88-95(2017)
    • DOI:10.13296/j.1001-1609.hva.2017.05.014    

      CLC: TM721.1
    • Published:2017

    移动端阅览

  • CHEN Bing, JIANG Xinhua. Feasibility Study on the Strategy of Time Division Switching off Sub-bank Filter in ±800 kV Pu’er Converter Station Isolated Island[J]. High voltageapparatus, 2017, 53(5): 88-95. DOI: 10.13296/j.1001-1609.hva.2017.05.014.

  •  
  •  

0

Views

47

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

The Supression Methods of DC Side Harmonic Current and Resonance Overvoltage Adorpted in Zhou-shan DC System
Influence of Difference of Three-phase Resistance of Closing Resistor of 750 kV Circuit Breaker on Overvoltage
On High-Voltage Engineering Course and Foreign Textbooks
VFTO Caused by Disconnector in GIS during Switching Small Capacitive Current
Digital Filtering Techniques of GIS Partial Discharge Detection

Related Author

尚金城
高怡
SONG Zhaohui
LOU Ying
ZHA Zhipeng
LI Zhenqiang
Chen Changyu
Wang Jiansheng

Related Institution

  西安输变电成套设计研究所  
Northwest Branch of State Grid Corporation of China
State Key Laboratory of Power Grid Environmental Protection
China Electric Power Research Institute
清华大学
0