您当前的位置:
首页 >
文章列表页 >
Electromagnetic Transient Study and Equipment Selection of Neutral Current-limiting Reactor Installation for Main Transformer in 500 kV Luoping Substation
更新时间:2025-04-26
    • Electromagnetic Transient Study and Equipment Selection of Neutral Current-limiting Reactor Installation for Main Transformer in 500 kV Luoping Substation

    • High VoltageApparatus   Vol. 53, Issue 5, Pages: 170-174(2017)
    • DOI:10.13296/j.1001-1609.hva.2017.05.027    

      CLC: TM471
    • Published:2017

    移动端阅览

  • WANG Dianlang, LI Dong, YANG Xiaowei, et al. Electromagnetic Transient Study and Equipment Selection of Neutral Current-limiting Reactor Installation for Main Transformer in 500 kV Luoping Substation[J]. High voltageapparatus, 2017, 53(5): 170-174. DOI: 10.13296/j.1001-1609.hva.2017.05.027.

  •  
  •  

0

Views

104

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research on Comprehensive Optimal Allocation Method of Short-circuit Current Suppression Measures Considering Safety-performance-cost
Research on DC Bias Control of Substation Based on Complex Network Theory
Recursive Least Square Correction Algorithm for Short-circuit Current Real-time Calculation
Analysis and Comparison of Two Multi-pulse Rectification Systems Based on Autotransformer
Analysis of 10 kV Anti-resonance PT Secondary Circuit

Related Author

CHEN Zhuo
WU Yaxiong
WU Kecheng
MA Xiongwen
DANG Cunlu
MA Zhi-ying
ZHENG Qing-shui
WANG Ping

Related Institution

Guangzhou Electric Power Design Institute Co., Ltd.
China Southern Power Grid Company Limited
Key Laboratory of Gansu Province Advanced Control for Industrial Processes
College of Electrical and Information Engineering, Lanzhou University of Technology
National Experimental Teaching Demonstration Center of Electrical and Control Engineering of Lanzhou University of Technology
0