ZHANG Shuqin, ZHANG Kexuan, GAO Yanfeng, et al. Some Problems Research of GIS On-site Acceptance and in Operation[J]. High voltageapparatus, 2017, 53(5): 193-199.
ZHANG Shuqin, ZHANG Kexuan, GAO Yanfeng, et al. Some Problems Research of GIS On-site Acceptance and in Operation[J]. High voltageapparatus, 2017, 53(5): 193-199. DOI: 10.13296/j.1001-1609.hva.2017.05.031.
Some Problems Research of GIS On-site Acceptance and in Operation
it is widely used in various voltage levels. In this paper
the simulative calculation and graphic analysis of the test waveforms obtained from the GIS field impulse insulation test is conducted firstly
which illustrates that the impulse test waveform is closely related to the GIS pipe-bus bar length.The test area should be simulated before field impulse test and the appropriate impulse test wave type is selected according to the results of simulation calculation. Secondly
the ferromagnetic resonance phenomena of electromagnetic voltage transformer(PT)are analyzed in site charging test. It is considered that the breaker’s inter electrode capacitance
too short bus connection to PT and the phase angle when the circuit breaker cutting off the PT are the main reason that cause PT core magnetic saturation and result in PT ferro-resonance. Thirdly
the different action times of the three-phase lightning arrester(LA)at the same position in GIS operation are analyzed. It is considered that the main reason is due to the phase angle difference 120° in three phase power system
which results in that the three phase switching overvoltage peaks are different at the breaker switching instant. And the impulse currents of three phase LAs installed in the same place are different. Finally
the stream shape creepage trace occurred on the insulator surface are explained. It is considered that arises from the breaker’s inter electrode capacitance and/or induction of adjacent transmission lines to no-load lines and results in the induced current flowing continuously on the insulator surface corroded by the arc decomposition
such current value is not high but the duration is longer. Through these problems research in GIS site acceptance and operation
it may provide theoretical basis with reference value and practical evidence for the safe operation of GIS.
Calculation and Measurement Analysis for Induced Voltage and Current of 500 kV/220 kV Mixed-voltage and Four-circuit Transmission Lines on the Same Tower
Simulation Analysis of Ferromagnetic Resonance of Voltage Transformer by Asymmetric Operation on Hybrid Lines
The Analysis on Whether ZnO Surge Arrester Can Protect H.V. Motor from Damage Caused by Switching Overvoltage of Vacuum Circuit Breaker
Induced Current Switching Tests of the Earthing Switches in Type ZFW-500 CIS
Overvoltage Calculation for Elimination of Closing Resistors in Tieling 500k V Power System
Related Author
HUANG Shiyang
NING Linru
CHEN Xiao
WANG Chenxing
LIN Tao
PENG Zhaowei
XU Dangguo
LI Yamei
Related Institution
Beijing Power Transmission and Transformation Co., Ltd.
State Grid Jibei Electric Power Co., Ltd.
State Grid Jibei Electric Power Co., Ltd. Electric Power Science Research Institute
State Grid Jinshan Power Supply Company
College of Electrical Engineering, Shanghai University of Electric Power