您当前的位置:
首页 >
文章列表页 >
Development of Live-working Fastening Bolts Robot for Transmission Lines
更新时间:2025-04-26
    • Development of Live-working Fastening Bolts Robot for Transmission Lines

    • High VoltageApparatus   Vol. 53, Issue 7, Pages: 147-152+158(2017)
    • DOI:10.13296/j.1001-1609.hva.2017.07.024    

      CLC: TM75;TP242
    • Published:2017

    移动端阅览

  • LI Wen, ZOU Dehua, LIU Xiaqing, et al. Development of Live-working Fastening Bolts Robot for Transmission Lines[J]. High voltageapparatus, 2017, 53(7): 147-152+158. DOI: 10.13296/j.1001-1609.hva.2017.07.024.

  •  
  •  

0

Views

384

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Control of Biaxial Linkage of Live Working Robot for Transmission Lines
MEC Service Deployment Mechanism of Transmission Line Based on Solar Energy Harvesting Under Power Internet of Things
Simulation Study on the Influence of Electric Field of 500 kV Single Circuit Transmission Line on UAV
Design of an Energy Extraction Power Supply for Video Monitoring of Transmission Lines
Calculation of Potential Transfer Current for Equipotential Live Working of 1 000 kV Transmission Line Tension Tower

Related Author

YAN Yu
LIU Xiaqing
ZOU Dehua
LI Wen
ZHANG Jianjun
LONG Yang
XU Xianjin
WU Gongping

Related Institution

State Grid Hunan Electric Power Company Live Working Center
Hunan Province Key Laboratory of Intelligent Live Working Technology and Equipment (Robot)
School of Mechanical Engineering,Hubei University of Technology
School of Power and Mechanical Engineering, Wuhan University
Information & Telecommunication Branch Company, East Inner Mongolia Electric Power Co., Ltd.
0