您当前的位置:
首页 >
文章列表页 >
Research on Site Drying Method of Large Capacity Power Transformer
更新时间:2025-04-26
    • Research on Site Drying Method of Large Capacity Power Transformer

    • High VoltageApparatus   Vol. 53, Issue 9, Pages: 171-175(2017)
    • DOI:10.13296/j.1001-1609.hva.2017.09.029    

      CLC: TM41
    • Published:2017

    移动端阅览

  • SHEN Hengyi, GE Yuan, HAN Shuyin. Research on Site Drying Method of Large Capacity Power Transformer[J]. High voltageapparatus, 2017, 53(9): 171-175. DOI: 10.13296/j.1001-1609.hva.2017.09.029.

  •  
  •  

0

Views

81

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

DIAGNOSIS AND HANDLING OF EXCESSIVE HIGH OIL TEMPERATURE OF A MAIN TRANSFORMER
TRACING OF IRON CORE GROUNDING PHENOMENON OF 220 kV MAIN TRANSFORMER AT JIAHE SUBSTATION
Analysis of 110 kV Main Transformer Subjected to Lightning Stroke
Urgent Treatment of a Transformer Accident
Analysis and Treatment of Abnormal Oil Level in OLTC of a Main Transformer

Related Author

HUANG Bing hong
LIN Jun chang
ZHU Wei-zheng
ZHANG Jian 1
LI Yong-sheng 1
MU Guang-qi 2
WANG Jian-wei 1
HUANG Bing-hong

Related Institution

Fujian Longyan Electric Power Bureau
Guangzhou Electric Power Industrial Bureau
Jiaxing Electric Power Bureau
Jinzhong Electric Power Bureau
Shanxi Electric Power Company
0