您当前的位置:
首页 >
文章列表页 >
Analysis of Influencing Factors on Long Term Temperature Rise of Direct Buried Power Cable
更新时间:2025-04-26
    • Analysis of Influencing Factors on Long Term Temperature Rise of Direct Buried Power Cable

    • High VoltageApparatus   Vol. 53, Issue 10, Pages: 178-182(2017)
    • DOI:10.13296/j.1001-1609.hva.2017.10.029    

      CLC: TM75
    • Published:2017

    移动端阅览

  • ZHOU Xiangxian, JIANG Yukuan, WANG Shaohua, et al. Analysis of Influencing Factors on Long Term Temperature Rise of Direct Buried Power Cable[J]. High voltageapparatus, 2017, 53(10): 178-182. DOI: 10.13296/j.1001-1609.hva.2017.10.029.

  •  
  •  

0

Views

164

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Overview of Condition Sensing and Detection Technology for Power Cables
Influence of External Cooling Modules on Hot-spot Temperature Rise of Distribution Transformer
Simulation of Temperature Field and Ampacity of Underground Cable System Based on Finite Element Method
Analysis and Simulation Calculation of Power Cable Overheating Fault Caused by Copper Shield Interval Winding
Research on Water-cooled Pipe Model of Underground Power Cable Groups

Related Author

HUANG Tao
XIAO Jiapeng
WANG Chao
ZHEN Weiyang
CHEN Yanwen
CHENG Yanting
ZHAO Peng
WU Chunfang

Related Institution

Jiangmen Power Supply Bureau of Guangdong Power Grid Co., Ltd.
School of Electric Power Engineering, South China University of Technology
Electric Power Research Institute, China Southern Power Grid
Department of Energy and Electrical Engineering, Nanchang University
State Grid Jiangxi Electric Power Co., Ltd.
0