Simulation Analysis for Induced Voltage and Induced Current in the Oil & Gas Pipeline Parallel Under 500 kV AC Double-circuit Transmission Lines on Same Tower
|更新时间:2025-04-26
|
Simulation Analysis for Induced Voltage and Induced Current in the Oil & Gas Pipeline Parallel Under 500 kV AC Double-circuit Transmission Lines on Same Tower
High VoltageApparatusVol. 53, Issue 10, Pages: 209-214(2017)
PAN Junwen, LUO Richeng, WU Dong. Simulation Analysis for Induced Voltage and Induced Current in the Oil & Gas Pipeline Parallel Under 500 kV AC Double-circuit Transmission Lines on Same Tower[J]. High voltageapparatus, 2017, 53(10): 209-214.
PAN Junwen, LUO Richeng, WU Dong. Simulation Analysis for Induced Voltage and Induced Current in the Oil & Gas Pipeline Parallel Under 500 kV AC Double-circuit Transmission Lines on Same Tower[J]. High voltageapparatus, 2017, 53(10): 209-214. DOI: 10.13296/j.1001-1609.hva.2017.10.034.
Simulation Analysis for Induced Voltage and Induced Current in the Oil & Gas Pipeline Parallel Under 500 kV AC Double-circuit Transmission Lines on Same Tower
There are parallel oil & gas pipelines under the high-voltage transmission lines
induced voltage and induced current caused by electrostatic induction and electromagnetic coupling accelerates the corrosion of pipeline.Based on electromagnetic transient program(ATP-EMTP)
the transmission line model and pipeline model are established
it is considered that the effect of different operation currents
parallel length
mark-height
soil resistivity and pipeline distance deviating from tower on induced voltage and induced current of the pipeline.The results show that electrostatic induction components on pipeline are mainly affected by operation currents
mark-height and pipeline distance deviating from tower.Electromagnetic coupling components on pipeline are mainly affected by operation currents
parallel length
mark-height
soil resistivity and pipeline distance deviating from tower.The conclusions can provide guidance for oil and gas pipeline corrosion protection.
Calculation and Measurement Analysis for Induced Voltage and Current of 500 kV/220 kV Mixed-voltage and Four-circuit Transmission Lines on the Same Tower
Research on Switching Induced Voltage and Current by Earthing Switch in 500/220 kV Four-circuit on One Tower
Study on Calculation and Measurement of Induced Voltage and Induced Current Between 750 kV Double-circuit Parallel Lines
Analysis on Influence of Different Aluminum Sheath Structure on Electrical Characteristics of Cable
Development and Project Application of Live Ice-melting System for UHVDC Transmission Lines
Related Author
HUANG Shiyang
NING Linru
CHEN Xiao
WANG Chenxing
LIN Tao
PENG Zhaowei
XU Dangguo
LI Yamei
Related Institution
Beijing Power Transmission and Transformation Co., Ltd.
State Grid Jibei Electric Power Co., Ltd.
State Grid Jibei Electric Power Co., Ltd. Electric Power Science Research Institute
Guangdong Electric Power Design Institute
Electric Power Research Institute of Guangdong Power Grid Corporation