WENG Xinlin, QIN Wenhong, ZHANG Xiaoping, et al. Analysis of a Delay Opening Fault of 220 kV SF6 Circuit Breaker[J]. High voltageapparatus, 2017, 53(10): 246-251.
Aiming to an accident of 220 kV circuit breaker in a substation
this paper analyzes the possible causes based on the action of relay protection equipment
on-site inspection test
preliminary judgment of the cause of the fault is hydraulic mechanism action delay.The operating characteristic model of the hydraulic mechanism of circuit breaker is built by using AMEsim software.The response characteristics of the control valve at the opening of the hy draulic mechanism are calculated and the relationship between the valve seat size and the outlet pressure is ana lyzed.According to the disassembly inspection status of the valve body of the hydraulic mechanism
it is presumed that the cause of the delay accident is defect in the manufacturing process of the hydraulic valve.The fault interrupter same model
same batch valve technology is replaced two-stage valve.