您当前的位置:
首页 >
文章列表页 >
Research on the Calculation Model for Transient Temperature Rise of Straight Buried Single-core Cable
更新时间:2025-04-26
    • Research on the Calculation Model for Transient Temperature Rise of Straight Buried Single-core Cable

    • High VoltageApparatus   Vol. 54, Issue 1, Pages: 158-163+169(2018)
    • DOI:10.13296/j.1001-1609.hva.2018.01.023    

      CLC: TM75
    • Published:2018

    移动端阅览

  • FU Chenzhao, SI Wenrong, ZHU Lingyu, et al. Research on the Calculation Model for Transient Temperature Rise of Straight Buried Single-core Cable[J]. High voltageapparatus, 2018, 54(1): 158-163+169. DOI: 10.13296/j.1001-1609.hva.2018.01.023.

  •  
  •  

0

Views

163

下载量

5

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research on the Fast Calculation Model for Transient Temperature Rise of Soil Directly Buried Cable Group
Research on Adaptability Simulation Validation of Transient Temperature Rise Thermal Circuit Model for Buried Cable Group Under Complex Environment
Study on Zero-sequence Distributed Parameter Live Line Measurement of Transmission Lines with Mutual Inductance
Research on Short-time Overload Current Limit for High Voltage XLPE Power Cables
Fast Calculation Method for Steady Temperature Rise of Buried Cable Group Based on Transfer Matrix

Related Author

FU Chenzhao
LIANG Yongchun
YANG Jian
SI Wenrong
HU Ning
GUO Jian-quan
HU Zhi-jian
GUO Jian-xin

Related Institution

Hebei University of Science and Technology
Xi'an Jiaotong University
Department of Electrical Engineering, Wuhan University
Xingtai County Power Company
Electric Power Research Institute,State Grid Henan Electric Power Company
0