您当前的位置:
首页 >
文章列表页 >
Research on the Fast Calculation Model for Transient Temperature Rise of Soil Directly Buried Cable Group
更新时间:2025-04-26
    • Research on the Fast Calculation Model for Transient Temperature Rise of Soil Directly Buried Cable Group

    • High VoltageApparatus   Vol. 54, Issue 2, Pages: 158-165(2018)
    • DOI:10.13296/j.1001-1609.hva.2018.02.026    

      CLC: TM75
    • Published:2018

    移动端阅览

  • FU Chenzhao, SI Wenrong, ZHU Lingyu, et al. Research on the Fast Calculation Model for Transient Temperature Rise of Soil Directly Buried Cable Group[J]. High voltageapparatus, 2018, 54(2): 158-165. DOI: 10.13296/j.1001-1609.hva.2018.02.026.

  •  
  •  

0

Views

200

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research on the Calculation Model for Transient Temperature Rise of Straight Buried Single-core Cable
Research on Adaptability Simulation Validation of Transient Temperature Rise Thermal Circuit Model for Buried Cable Group Under Complex Environment
Study on Zero-sequence Distributed Parameter Live Line Measurement of Transmission Lines with Mutual Inductance
Research on Short-time Overload Current Limit for High Voltage XLPE Power Cables
Numerical Calculation and Analysis of Transient Temperature Rise of 1 250 A Plug-in Butt-contact Based on Field-coupled Finite Element Method

Related Author

FU Chenzhao
LIANG Yongchun
YANG Jian
SI Wenrong
HU Ning
ZHAN Feng
GUO Jian-xin
HU Zhi-jian

Related Institution

Xi'an Jiaotong University
Hebei University of Science and Technology
Department of Electrical Engineering, Wuhan University
Xingtai County Power Company
Electric Power Research Institute,State Grid Henan Electric Power Company
0