Study and Design of Main Circuit Parameters for ±800 kV UHVDC Transmission Project from Zhalute to Qingzhou
更新时间:2025-04-26
    • Study and Design of Main Circuit Parameters for ±800 kV UHVDC Transmission Project from Zhalute to Qingzhou

    • High VoltageApparatus   Vol. 54, Issue 4, Pages: 128-134(2018)
    • DOI:10.13296/j.1001-1609.hva.2018.04.018    

      CLC: TM721.1
    • Published:2018

    移动端阅览

  • LUO Hanwu, LE Jian, MAO Tao, et al. Study and Design of Main Circuit Parameters for ±800 kV UHVDC Transmission Project from Zhalute to Qingzhou[J]. High voltageapparatus, 2018, 54(4): 128-134. DOI: 10.13296/j.1001-1609.hva.2018.04.018.

  •  
  •  

0

Views

242

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research of Conductive Electromagnetic Interference in Converter Station of ZhaluteQingzhou ±800 kV UHVDC Project
Operational Test and Special Test of Converter Valves for ±800 kV UHVDC Project Ximeng Converter Station
Study on Overvoltage Characteristics and Influencing Factors of UHVDC Converter Station in Grounding Fault Condition
Study on Internal Heat Transfer Characteristics of Converter Transformer Under OFAF Cooling Mode
Research and Analysis on Harmonic Current Switching Test Technology of Vacuum Type On-load Tap-changer for Converter Transformer

Related Author

HUANG Xidong
HU Zhilong
ZHOU Huigao
TONG Congwei
WANG Ben
ZHANG Teng
XU Zimeng
ZHANG Changchun

Related Institution

Xi’an High Voltage Apparatus Research Institute Co.,Ltd.
College of Electrical Engineering, Xi'an Jiaotong University
Super High Voltage Company of State Grid Ningxia Electric Power Co., Ltd.
School of Energy and Power Engineering, Xi'an Jiaotong University
Electric Power Research Institute of EHV Power Transmission Company of China Southern Power Grid Co
0