您当前的位置:
首页 >
文章列表页 >
Risk Assessment Method of Substation in Trial Stage Based on Centralized Monitoring of Transmission and Transformation Equipment
更新时间:2025-04-26
    • Risk Assessment Method of Substation in Trial Stage Based on Centralized Monitoring of Transmission and Transformation Equipment

    • High VoltageApparatus   Vol. 54, Issue 4, Pages: 245-249(2018)
    • DOI:10.13296/j.1001-1609.hva.2018.04.038    

      CLC:

    移动端阅览

  • XU Xianghai, YANG Xuan, SHI Rui, et al. Risk Assessment Method of Substation in Trial Stage Based on Centralized Monitoring of Transmission and Transformation Equipment[J]. High voltageapparatus, 2018, 54(4): 245-249. DOI: 10.13296/j.1001-1609.hva.2018.04.038.

  •  
  •  

0

Views

120

下载量

4

CSCD

Alert me when the article has been cited
提交
Tools
Export Citation
Share
Add to favorites
Add to my album

Related Articles

No data

Related Author

ZHANG Chengwu
XU Jinshuai
WANG Wei
MA Aiqing
TIAN Yu
ZHANG Han
ZHAO Wei
TONG Hangwei

Related Institution

No data
0