您当前的位置:
首页 >
文章列表页 >
Operational Test and Special Test of Converter Valves for ±800 kV UHVDC Project Ximeng Converter Station
更新时间:2025-04-26
    • Operational Test and Special Test of Converter Valves for ±800 kV UHVDC Project Ximeng Converter Station

    • High VoltageApparatus   Vol. 54, Issue 8, Pages: 114-119(2018)
    • DOI:10.13296/j.1001-1609.hva.2018.08.018    

      CLC: TM721.1
    • Published:2018

    移动端阅览

  • HUANG Xidong, HU Zhilong, ZHOU Huigao, et al. Operational Test and Special Test of Converter Valves for ±800 kV UHVDC Project Ximeng Converter Station[J]. High voltageapparatus, 2018, 54(8): 114-119. DOI: 10.13296/j.1001-1609.hva.2018.08.018.

  •  
  •  

0

Views

134

下载量

4

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Study and Design of Main Circuit Parameters for ±800 kV UHVDC Transmission Project from Zhalute to Qingzhou
Study on Overvoltage Characteristics and Influencing Factors of UHVDC Converter Station in Grounding Fault Condition
Research and Engineering Practice on Cooling of TFM Board for UHVDC Converter Valve
Modeling of Passive Broadband Equivalent Circuit Model for High Voltage DC Converter Valve
Automatic Re-synchronization Control Strategy of UHVDC Converter Transformer Taps

Related Author

LUO Hanwu
LE Jian
MAO Tao
LI Mengke
XU Xinyao
CUI Shigang
KANG Chao
WANG Zhiyuan

Related Institution

Wuhan Donghu University
School of Electrical Engineering, Wuhan University
State Grid East Inner Mongolia Electric Power Maintenance Company
College of Electrical Engineering, Xi'an Jiaotong University
State Grid Hebei Electric Power Research Institute
0