Comparison and Optimization of Feasible Schemes for On-site Assembly of ± 1100 kV Converter Transformer
±1 100 kV converter transformer is the key equipment of ± 1 100 k V HVDC project. The volume andweight of the converter transformer exceed the limit of transportation due to the large increase of voltage level and ca-pacity. Accordingly it is necessary to use the disintegrating transportation and on-site assembly. In this paper
4 pos-sible schemes are proposed for the transportation and on-site assembly of the ±1 100 k V converter transformer
in-cluding scheme of using single-body temporary oil tank
scheme of using dual-body temporary oil tank
scheme ofcomponents transportation and on-site assembly and scheme of two converter transformers in series or in parallel. Af-ter comparing the feasibility and applicability of the 4 schemes
it is considered that scheme of components transpor-tation and on-site assembly is the best scheme for the ±1 100 kV converter transformer.