您当前的位置:
首页 >
文章列表页 >
Defect and Improved Method of DC Wall Bushing Design in ±800 kV UHVDC Transmission Project
更新时间:2025-04-26
    • Defect and Improved Method of DC Wall Bushing Design in ±800 kV UHVDC Transmission Project

    • High VoltageApparatus   Vol. 55, Issue 4, Pages: 239-244(2019)
    • DOI:10.13296/j.1001-1609.hva.2019.04.034    

      CLC: TM216.5
    • Published:2019

    移动端阅览

  • ZHANG Qihao, WU Deguan, MA Zhenglin. Defect and Improved Method of DC Wall Bushing Design in ±800 kV UHVDC Transmission Project[J]. High voltageapparatus, 2019, 55(4): 239-244. DOI: 10.13296/j.1001-1609.hva.2019.04.034.

  •  
  •  

0

Views

137

下载量

8

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Measuring Loop Resistance of GIS Conductor Pole with Impulse Current Method
Assessment of GIS Electrical Contact State by Means of Kiloampere Grade Impact Current
Improvement of the Loop Resistance Measurement for 1000 kV UHV Circuit Breaker
Analysis of Abnormal Increase of Loop Resistance for Porcelain Post Circuit Breaker
Study on Loop Resistance Characteristics of GIS

Related Author

LI Lei
ZHANG Bo
LU Tie-cheng
HUANG Song-bo
WANG Yan
LUO Rong-bo
LU Tiecheng
MIAO Yinyin

Related Institution

Foshan Power Supply Company
School of Electrical Engineering, Wuhan University
Foshan Power Supply Bureau of Guangdong Power Grid Company
State Grid Shanghai Maintenance Company
Shanghai Jiao Tong University
0