您当前的位置:
首页 >
文章列表页 >
Typical Process Analysis of Generator Trip in Shanghai Grid and Proposal of Big Data Platform
更新时间:2025-04-26
    • Typical Process Analysis of Generator Trip in Shanghai Grid and Proposal of Big Data Platform

    • High VoltageApparatus   Vol. 55, Issue 5, Pages: 207-213(2019)
    • DOI:10.13296/j.1001-1609.hva.2019.05.032    

      CLC: TM73
    • Published:2019

    移动端阅览

  • CHEN Hongxing, WANG Jing, GU Chengyu, et al. Typical Process Analysis of Generator Trip in Shanghai Grid and Proposal of Big Data Platform[J]. High voltageapparatus, 2019, 55(5): 207-213. DOI: 10.13296/j.1001-1609.hva.2019.05.032.

  •  
  •  

0

Views

81

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

APPLICATION OF INFORMATION FUSION TECHNIQUE TO TRANSFORMER FAULT DIAGNOSIS
DISTRIBUTION OF ELECTRIC FIELD AT THE WINDING END OF GENERATOR STATOR
ANALYSIS OF THE WITHSTAND VOLTAGE TEST FOR LING’AO NUCLEAR POWER GENERATOR
RESEARCH ON OIL-DISSOLVED GAS ANALYSIS AND FAULT DIAGNOSIS BY DATA MINING TECHNOLOGY
RESEARCH OF APPLICATION OF WAVELET TRANSFORM TO LOSS-OF-EXCITATION PROTECTION OF GENERATOR

Related Author

XIA Xiang-yang
LUO An
DENG Yu
HAN Zhen-dong
JIANG Xiu-chen
LU Wen-e
TANG Xiao-ming
HE Jun-jia

Related Institution

  中南大学信息科学与工程学院 湖南长沙410083  
Central South University
  上海交通大学 上海200030  
Shanghai Jiaotong University
Lingdong Nuclear Power Company
0