UHV Current Transformer with Self-calibration Function
To carry out the error commissioning test after installation of a UHV current transformer(CT)
standard CT
high-current generator and other equipment are required to connect from the outside through two outlet-bushings of the CIS to form a closed high capacity current test circuit.However
this method is difficult to be implemented
and needs to design the circuit breaker
disconnecting switch and other equipment in accordance with the composition of high capacity current circuit because of the adoption of the grounding switch
which means higher requirements for equipment manufacturing.To solve this problem
a double-winding design of CT secondary side is proposed based on the Ampere circuital theorem to form 1:1 self-calibration mode of the coil current
then in test only one of the CT secondary windings is applied with the rated secondary current.To verify the feasibility of this technology
the design principle and operation mode of the CT are introduced
a mathematical model and a simulation model of the CT are established to carry out vector analysis of the self-calibration CT error
and the error characteristics of the same CT in two operation states are analyzed through comparison between the differences of the self-calibration CT and the schematic circuit.Moreover
based on the typical parameters of the CT in the Anhui-to-East UHV Transmission Line Project
a CT prototype is developed to carried out insulation test and error test.Test data show that the insulation of the developed CT meets the requirement of the UHV project
both operation error and self-calibration error are within the limit of 0.2 S level
and the variation of the errors with the rated current is consistent
the deviation is within the error limit of 0.1 level.Theoretical analysis and measurement show that the self-calibration data can reflect the error situation in the case of operation.This design method may provide a technical support for simplifying the onsite error commissioning test for UHV CT.
Study on Seismic Performance Improvement Methods for Gas-insulated Transmission Lines (GIL) in Ultra-high Voltage Converter Station
Research on Influence of Piezoelectric Material Properties and Element Size on Sensitivity of Piezoelectric Sensor for Partial Discharge Monitoring of Transformer
Study on Temperature Distribution of Epoxy Insulated Power Electronic Transformer Based on Fluid-solid-structure Coupling
Analysis of Maximum Compression Displacement and Fatigue Life of Bellows
Related Author
YANG Rui
SI Xiaochuang
FANG Qi
XU Zhongxun
FEI Xiang
JIANG Chengbo
ZHANG Xinmiao
YUAN Duanpeng
Related Institution
Pinggao Group Co., Ltd.
Henan Pinggao Electric Co., Ltd.
China Southern Power Grid Co., Ltd.
CSG Extra High Voltage Power Transmission Company, Dali Bureau
Department of Electric Power Sensing Technology, Global Energy Interconnection Research Institute Co., Ltd.