您当前的位置:
首页 >
文章列表页 >
Fault Analysis and Improvement Measures of GIL Three-pillar Insulator in UHVDC Transmission Project
更新时间:2025-04-26
    • Fault Analysis and Improvement Measures of GIL Three-pillar Insulator in UHVDC Transmission Project

    • High VoltageApparatus   Vol. 56, Issue 1, Pages: 246-252(2020)
    • DOI:10.13296/j.1001-1609.hva.2020.01.037    

      CLC: TM216;TM721.1
    • Published:2020

    移动端阅览

  • WANG Jingfei, ZHANG Qiang, LI Xiangbin, et al. Fault Analysis and Improvement Measures of GIL Three-pillar Insulator in UHVDC Transmission Project[J]. High voltageapparatus, 2020, 56(1): 246-252. DOI: 10.13296/j.1001-1609.hva.2020.01.037.

  •  
  •  

0

Views

241

下载量

12

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Diagnosis and Analysis About Ultrasonic PD Signal Abnormality of GIL Equipment
Influence of Different Structure and Specification Paramete on the Propagation Characteristics of Optical Signals Generated by GIL Partial Discharge
Research on GIL Mechanical Fault Detection System Based on Combined Vibration and Acoustic Location Technology
Surface Charge Accumulation Characteristic on GIL Three-pillar Insulator
Optimal Control Strategy of Stability for Grid-forming Photovoltaic Based on DC Voltage Feedforward

Related Author

HUANG Heyan
WU Deguan
XIA Hu
LI Hongyuan
PAN Kai
SHAO Chenglin
YAO Weijia
QIAN Yong

Related Institution

Test & Maintenance Center of CSG EHV Transmission Company
Department of Electrical Engineering, Shanghai Jiao Tong University
Hubei Institute of Measurement and Testing Technology
School of Electrical and Electronic Engineering, Huazhong University of Science and Technology
Maintenance & Test Center of EHV Power Transmission Company China Southern Power Grid
0