LI Weiguo, ZHANG Changhong, YANG Xu, et al. Simulation Calculation and Test Verification of GIS Functional Module with Double-break Disconnector[J]. High voltageapparatus, 2020, 56(3): 30-38.
LI Weiguo, ZHANG Changhong, YANG Xu, et al. Simulation Calculation and Test Verification of GIS Functional Module with Double-break Disconnector[J]. High voltageapparatus, 2020, 56(3): 30-38. DOI: 10.13296/j.1001-1609.hva.2020.03.005.
Simulation Calculation and Test Verification of GIS Functional Module with Double-break Disconnector
The double-fracture disconnect switch(DDS)is a solution to continue operating without shutting down during GIS extension and withstand tests
which is designed as an nonstandard structure.In order to verify that the DDS satisfies the actual operating conditions.In this paper
the 3 D simulation models of DDS for the mechanical
electrical
thermal field are established by Ansys.The simulation calculation of mechanical strength
insulation strength and current-carrying capability of the DDS are carried out.In addition
the insulation test
temperature-rise test
dynamical thermal stability test
mechanical life test
high and low temperature test
busbar transfer current test
shell water pressure test are carried on the real DDS as well.The results show that the maximum stress of the shell is235.08 MPa
and the maximum stress of cover plate is 114.86 MPa
which are both less than the allowable stress.It also show that the electrical field of each component in the DDS is lower than the allowable field strength.As for the temperature test
the maximum temperature rise of sliding joint and the shell are 56.5 K and 17.3 K.Temperature rise of both internal conductor and shell meet the requirements.In sum
the experimental results consistent with the simulation calculation.The DDS has been applied to 6 standby expansion intervals of 220 kV GIS in the±800 kV Dong-Fang converter station.