YANG Fan, SHE Zhengqiu, ZHANG Xiang, et al. Development and Realization of Thyristor Valve Function Test System Based on Coordination with VBE[J]. High voltageapparatus, 2020, 56(6): 269-273+281.
YANG Fan, SHE Zhengqiu, ZHANG Xiang, et al. Development and Realization of Thyristor Valve Function Test System Based on Coordination with VBE[J]. High voltageapparatus, 2020, 56(6): 269-273+281. DOI: 10.13296/j.1001-1609.hva.2020.06.039.
Development and Realization of Thyristor Valve Function Test System Based on Coordination with VBE
DC-based deicing etc. The performance of Thyristorvalve is significant to the normal operation of the project. Between installation and commissioning
or after the re-placement of thyristor-level components
functional test must be carried out on the thyristor levels to check its volt-age
current and optical signal under a variety of operation conditions
and to judge whether all functions and perfor-mance are normal. During site test the normal operation fiber connected between TCU and VBE must be changed totest fiber which is connected between TCU and tester in order to trigger thyristor. When finished
optical fiber mustbe changed back. Repeated plug-pull may cause contamination and damage to optical fiber and other optical devic-es
and it can’t be determined whether the function is normal after reinsertion
finally decrease system reliability.Therefore
it is necessary to design a thyristor valve functional test system for the site test. All tests of thyristor level
including impedance
firing
protection
withstand voltage strength and other items
can be carried out without mov-ing any connected fibers. Based on coordination of the function and timing sequence between the tester and VBE
thetester
thyristor valve and VBE are combined to form a functional test system. During test