您当前的位置:
首页 >
文章列表页 >
Research on Actuation Time Forecasting of UHV Circuit Breaker Based on Hadoop Platform
更新时间:2025-04-26
    • Research on Actuation Time Forecasting of UHV Circuit Breaker Based on Hadoop Platform

    • High VoltageApparatus   Vol. 56, Issue 7, Pages: 56-62(2020)
    • DOI:10.13296/j.1001-1609.hva.2020.07.009    

      CLC: TM561
    • Published:2020

    移动端阅览

  • DUAN Xiongying, XIAO Chenchen, ZHAO Yangyang, et al. Research on Actuation Time Forecasting of UHV Circuit Breaker Based on Hadoop Platform[J]. High voltageapparatus, 2020, 56(7): 56-62. DOI: 10.13296/j.1001-1609.hva.2020.07.009.

  •  
  •  

0

Views

77

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

THE MOVING CHARACTERISTIC SIMULATION OF HIGH VOLTAGE CIRCUIT BREAKER
New Approach to Solving the Sealing Problem of Piston Lever in CY5 Type Hydraulic Energy-storage Cylinder
Analysis and Disposal of Inner Leak of Hydraulic Mechanism on LW6 Breaker
Modification of the 800 kV Tank Circuit Breaker’s Hydraulic Mechanism in Pingliang Substation
Accident Analysis for a Unsuccessful 500kV Circuit Breaker Reclosing

Related Author

TONG Ming-an
MA Zhi-ying
TAN Jian-guo
WU Jun-hui
SUN Yi
FENG Xiu-bin
MA Xi-lin1
ZHANG Tao1

Related Institution

  陕西西安710049  
  陕西 西安 710065  
Northwestern Polytechnical University
ZTE Corporation
Xi’an Jiaotong University
0