Research on Entering Path to Equipotential Level of 500 kV AC-DC Double-circuit Transmission Line According to Body Surface Electric Field Strength
The clearance of the 500 kV AC-DC mixed voltage lines on the same tower is narrow and the arrangement of the wires is complicated. In order to determine the maximum electric field strength on body surface and the entering path to equipotential level for the workers
who are engaged for live operation on 500 kV AC-DC mixed-voltage double-circuit transmission line
the straight-line tower for the AC-DC mixed-voltage double-circuit transmission line of the Zhang-Bei flexible 500 kV DC transmission line project is taken as an example to establish model in the finite element simulation software Ansys. The body surface electric field strengths of a worker entering into all possible equipotential paths of the AC circuit of the mixed-voltage double-circuit line are calculated and analyzed in the typical working conditions of middle phase
side phase
and DC circuit
and then the optimum path for entering equipotential level is determined according to the maximum electric field strength distribution on body surface. The results show that the maximum values of the body surface electric field strength at the middle-phase and side-phase wires in the AC circuit tower window are 1 875 and 1 032 kV/m
respectively
and the maximum value at the DC pole wires is1 110 kV/m. The average body surface electric field strength is the largest during the whole process of the worker entering the equipotential level vertically. For the AC-DC mixed-voltage double-circuit line on the same tower
the entering angle has an important influence on the electric field distribution on human body surface. The optimal angles entering the equipotential level of middle phase and side phase of the wires in the AC cup type tower are 45° and50°
respectively
while the optimal angle entering the equipotential path of the DC pole wires is 30°.
Research on Human Digital Twins for Live Working on Transmission Lines Based on Attitude Estimation
Study on the Amplitude and Energy Characteristics of the in and out of Equipotential Pulse Current for 1000 kV Transmission Line Tension Tower Based on HHT
Live Working Insulation Blanket Surface Defect Recognition Based on Improved YOLOv8
Insulation Protection Design of Live working Robot for 10 kV Distribution Power Systems
Feasibility Research of Live Working on 500 kV Compact Line
Related Author
ZHANG Chengwu
XU Jinshuai
WANG Wei
MA Aiqing
WU Tian
SONG Xuan
PENG Yong
QIU Zhonghua
Related Institution
School of Electrical Engineering, Shanghai University of Electric Power
State Grid Sichuan Extra High Voltage Company
China Electric Power Research Institute
Hubei Provincial Engineering Technology Research Center for Power Transmission Line, China Three Gorges University
College of Electrical Engineering & New Energy, China Three Gorges University