Research on Some Problems in the Mass Production of Common Enclosure GIS
With the development of GIS from single-phase in an enclosure to three-phase in an enclosure
many new topics have emerged.When the short-circuit fault occurs
the electromagnetic force of the three-phase bus is about tens times as that of the single-phase bus.Such a large electromagnetic force must be borne by the three-phase bus insulated basin
so its inter-phase mechanical strength is particularly important.At present
there are few relative standards and technical data about the inter-phase mechanical strength of three-phase bus insulated basin
GIS equipment manufacturers are based on their own internal standards for testing.Few experiments have been carried out to verify the mechanical properties of the interphase which is inconsistent with the actual operation of three-phase GIS.This paper presents a test device and test method for interphase mechanical test for reference.According to GB7674-2008 APPENDIX B "GIS test method under internal fault arc condition"
for the three-phase common enclosure GIS
the three-phase arc test of arc burning between phases should be carried out
that is
the arc burns between phases and does not last between the bus conductor and the enclosure.It is not appropriate to use the enclosure burn-through time to check the external effect of the arc.In this paper
it is put forward that the duration of explosionproof film is reasonable to evaluate the external effect of arc.Finally
the bad partial discharge problem of GIS in mass production is analyzed and verified by experiments
It is believed that this is caused by the assembly air gap discharge between the the three-phase common enclosure insulated basin and its external metal flange
the problem was solved by applying conductive adhesive to the periphery of the insulated basin before assembly.At the same time
it is pointed out that for the assembled insulated basin with external metal flanges
it will be helpful to improvethe performance of partial discharge of GIS if proper metal shielding ring is added in the interior of low potential areaduring the development and design. Through the theoretical analysis of these issues
we can provide valuable experience for GIS research and development
Research on Application of Microphone-optimized Spiral Arrays-based Acoustic Imaging Devices in Partial Discharge Localization
Study on Fiber Interferometric Partial Discharge Ultrasonic Sensing Method Based on Acoustic-optic Modulation and RF Phase Detection
High-frequency Sensing Technology of Partial Discharge of Switchgear Cabinet for Wind Solar & Energy Storage Stations in Gobi Deserts
Research on Influence of Piezoelectric Material Properties and Element Size on Sensitivity of Piezoelectric Sensor for Partial Discharge Monitoring of Transformer
Influence of Environmental Factors on Insulation Performance of Separable Connector for 12 kV Gas Filling Switchgear Cabinet
Related Author
YUE Song
GAO Fei
HAN Shuai
DONG Haoyuan
LI Jun
LI Xin
LIU Chao
QIAO Hui
Related Institution
Electric Power Research Institute of State Grid Tibet Company
China Electric Power Research Institute Co., Ltd.
Iflytek Co., Ltd.
Electric Power Research Institute, State Grid Hebei Electric Power Co., Ltd.
State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources, North China Electric Power University