ZHAO Lin, YE Liya, ZHAN Huamao, et al. Investigation of Repeated Breakdown Process During Very-fast Transient Overvoltage Test of Overall Switching Process of Disconnector in GIS[J]. High voltageapparatus, 2020, 56(11): 130-138.
ZHAO Lin, YE Liya, ZHAN Huamao, et al. Investigation of Repeated Breakdown Process During Very-fast Transient Overvoltage Test of Overall Switching Process of Disconnector in GIS[J]. High voltageapparatus, 2020, 56(11): 130-138. DOI: 10.13296/j.1001-1609.hva.2020.11.021.
Investigation of Repeated Breakdown Process During Very-fast Transient Overvoltage Test of Overall Switching Process of Disconnector in GIS
The existing very-fast transient overvoltage(VFTO)repeated breakdown simulation model does not consider the breakdown characteristics of the disconnector contact gap
and the arc resistance model cannot fully reflect the dynamic changes of the arc.Therefore
a 252 kV GIS test platform was established in this study to obtain the breakdown characteristics during switching on/off a disconnector.The AC/DC combined discharge of the contact gap was tested
and a test method of repeated discharge voltage curve was proposed.Considering such influence factors as current peak value
arc length and air pressure
as well as the arc extinction law of very-fast transient over-current(VFTC)
a double-exponential high-frequency arc resistance model was proposed.Then
based on the repeated breakdown voltage curve and the arc resistance model
the whole-process VFTO simulation model of 252 kV GIS loop was established.Further
the adaptive variable step method was applied to alternate calculations of the power-frequency steady-state and high-frequency transient process to obtain an efficient simulation of the whole-process VFTO.The accuracy of the simulation model was verified by comparing test waveforms.In addition
the GIS test circuit in Wuhan AC ultra-high voltage(UHV) GIS test base was used to simulate the entire process of VFTO
thus the applicability of the proposed simulation method was verified.