LI Dejun, ZHOU Jian, ZHONG Xiaotai, et al. Design,Application and Prospect of Transformer and GIS in Booster Substation for Offshore Wind Farm[J]. High voltageapparatus, 2021, 57(1): 1-11.
LI Dejun, ZHOU Jian, ZHONG Xiaotai, et al. Design,Application and Prospect of Transformer and GIS in Booster Substation for Offshore Wind Farm[J]. High voltageapparatus, 2021, 57(1): 1-11. DOI: 10.13296/j.1001-1609.hva.2021.01.001.
Design,Application and Prospect of Transformer and GIS in Booster Substation for Offshore Wind Farm
基于实际的工程应用经验对海上升压站主变压器的设计和选型进行了阐述并提出了一些建议;随后给出了高压GIS在设计布置和选型时的主要考量和应对措施;最后对分布式模块化OTM海上变电站和风机66 k V集电系统等海上风电新技术和新需求进行了介绍和应用展望。文中
如无特殊说明
所有"海上升压站"的表述均特指海上交流升压站。
Abstract
Offshore AC booster substations
as the key construction facility of large offshore wind farm
is the hub of power distribution of offshore wind farm and its design optimization plays an important role for the economy performance
reliability
availability
maintenance and safety etc of the construction and operat
ion of the whole wind farm.The first offshore AC booster substation in China was put into service in 2015 on the site of CGNPC Rudong wind farm
[1]
.Compared to mature onshore AC substations
the offshore AC booster substation in China is still in its initial stage in the aspect of either design or operation.Meanwhile the relevant design standards and technical specifications are also not perfect.Therefore
in case of harsh offshore conditions
the technical specifications and selection of power transformers
&
GIS for an offshore substation become particularly critical.Based on rich delivery experiences in offshore booster substation in Europe
Siemens energy has supplied or is supplying such electrical equipment as power transformers and GIS for dozens of offshore substations in China.Although the application experience on the onshore substation in the past decades makes these products fully meet the application requirement of offshore booster station in the field of electrical design
yet it still faces much harsher challenge from a marine environment regarding mechanical design and environmental adaptation.Moreover
the initial investment for an offshore platform equipment(including substation) is very expensive
at the same time
the subsequent maintenance of the equipment in the offshore booster station is not only difficult but also expensive.Thus
how to reduce the investment and maintenance cost by the prior design selection of the main equipment is also a matter of concern.In this paper
constitution of offshore AC platform and offshore power grid is introduced firstly
then the design and type selection of main power transformer for an offshore booster substation are described based on the actual engineering application experience and also from such aspects as safety
reliability
layout optimization
installation
commissioning
operation and subsequent maintenance and some suggestions are proposed.After that
the main consideration and countermeasures in the design layout and type selection of high voltag
e GIS are given.Finally
both new technology and new requirement of such offshore wind power as OTM offshore substations and 66 kV array systems are given and their application is prospected.If not otherwise stated