LIU Tong, TENG Yun, YANG Jinggang, et al. Study on AC Withstand Voltage Breakdown Discharge Location of GIL Equipment Based on Audible-signal[J]. High voltageapparatus, 2021, 57(1): 26-32+40.
LIU Tong, TENG Yun, YANG Jinggang, et al. Study on AC Withstand Voltage Breakdown Discharge Location of GIL Equipment Based on Audible-signal[J]. High voltageapparatus, 2021, 57(1): 26-32+40. DOI: 10.13296/j.1001-1609.hva.2021.01.004.
Study on AC Withstand Voltage Breakdown Discharge Location of GIL Equipment Based on Audible-signal
For accurately locating breakdown discharge point of GIL equipment in withstand voltage test
in this paper
a section of busbar compartment on 110 kV GIS is selected to simulate GIL equipment and perform the study on AC withstand voltage breakdown discharge location of GIL equipment based on audible signal.In view of the background noise in the audible signal in case of breakdown discharge of GIL equipment
the denoising method of the acoustic signal is firstly studied with the combination of complete ensemble empirical mode decomposition with adaptive noise(CEEMDAN) and the wavelet threshold algorithm
the background noise in the acoustic signal is removed
then the time difference method is used and the direct acoustic start edge is taken as the calibration time to estimate the time delay to achieve the space location of discharge point.It is shown by the test and analysis result that the proposed de-noising method can suppress effectively the noise interference of acoustic signal in the breakdown discharge of GIL
and the location method based on audible signal determines the discharge point successfully with location error within 15 cm and can meet the engineering requirements.