HAN Honggang, LI Shuang, LU Xuchen, et al. Influence of Operation Times on the Insulation Performance of Main Contacts in Ultra and Extra-high Voltage Circuit Breaker[J]. High voltageapparatus, 2021, 57(1): 150-156+164.
HAN Honggang, LI Shuang, LU Xuchen, et al. Influence of Operation Times on the Insulation Performance of Main Contacts in Ultra and Extra-high Voltage Circuit Breaker[J]. High voltageapparatus, 2021, 57(1): 150-156+164. DOI: 10.13296/j.1001-1609.hva.2021.01.022.
Influence of Operation Times on the Insulation Performance of Main Contacts in Ultra and Extra-high Voltage Circuit Breaker
In order to study the influence on the main contact insulation versus operation times in the condition that contact is supported by the closed insulation cylinder of ultra-high-voltage tank circuit breaker.Take one case for example
the insulation of breaker’s main contact was breakdown in the process of generator grid synchronization.First
the model of insulation breakdown probability versus operation times is created.Then
using the finite element method
the influence of the amount
shape and distribution of the debris produced by the main contact abrasion on the insulation strength of the main fracture is calculated.Finally
an improvement measure is proposed to prevent the mechanical wear of the main contact from affecting the insulation of the main breaker.The research shows that under the reverse voltage
when operation times reaches between 211 and 571
the probability of main contact insulation breakdown is 99.74%;when operation times is less than 211
the accumulation of particle is faster
but the distribution gap is larger and the maximum field strength is less than the breakdown field strength;when the number of operations is between 211 and 571
the particle growth slows down
the distribution gap is small
and the maximum field between the main contacts is stronger than the breakdown field strength
then the insulation breakdown to be the sure incident.