Simulation Calculation on Breakdown Process of Open Contacts of Bus Disconnector During Withstand Voltage Test of GIS with Same Frequency and Phase-angle
|更新时间:2025-04-26
|
Simulation Calculation on Breakdown Process of Open Contacts of Bus Disconnector During Withstand Voltage Test of GIS with Same Frequency and Phase-angle
High VoltageApparatusVol. 57, Issue 5, Pages: 101-107(2021)
LI Wenhui, YANG Dingge, HAN Yanhua, et al. Simulation Calculation on Breakdown Process of Open Contacts of Bus Disconnector During Withstand Voltage Test of GIS with Same Frequency and Phase-angle[J]. High voltageapparatus, 2021, 57(5): 101-107.
LI Wenhui, YANG Dingge, HAN Yanhua, et al. Simulation Calculation on Breakdown Process of Open Contacts of Bus Disconnector During Withstand Voltage Test of GIS with Same Frequency and Phase-angle[J]. High voltageapparatus, 2021, 57(5): 101-107. DOI: 10.13296/j.1001-1609.hva.2021.05.014.
Simulation Calculation on Breakdown Process of Open Contacts of Bus Disconnector During Withstand Voltage Test of GIS with Same Frequency and Phase-angle
In case of breakdown across open contacts of bus disconnector of the test phase due to accident of same frequency and phase-angle withstand voltage test of GIS equipment
the corresponding bus voltage of the test bay may generate distortion and the protection bay may perform mal-operation.For assessing influence of the transient process on the operation bus and the series resonance device at the test side
it is necessary to simulate the voltage and current waveforms of each key node in the breakdown transient across open contacts.Such two types of ATP-EM-TP simulation models at grid side and test side true models are set up.The transient process after the breakdown across open contacts of bus disconnector due to failure of the same frequency and phase-angle withstand voltage test is simulated and calculated
the over voltage and over current waveform as well as peak during the process is obtained.The correctness of the two types of models and the influence of breakdown process on the same frequency and phase-angle withstand voltage test are evaluated.It is shown by the simulation result that the true model of the grid side can reflect the over voltage and overcurrent situation better in case of failure of the test.