Study on Fast Calculation Method for Temperature Rise of Complex Direct Soil-buried Cable Group Core
更新时间:2025-04-26
    • Study on Fast Calculation Method for Temperature Rise of Complex Direct Soil-buried Cable Group Core

    • High VoltageApparatus   Vol. 57, Issue 5, Pages: 130-136(2021)
    • DOI:10.13296/j.1001-1609.hva.2021.05.018    

      CLC: TM75
    • Published:2021

    移动端阅览

  • FU Chenzhao, HAO Qian, LIANG Yongchun, et al. Study on Fast Calculation Method for Temperature Rise of Complex Direct Soil-buried Cable Group Core[J]. High voltageapparatus, 2021, 57(5): 130-136. DOI: 10.13296/j.1001-1609.hva.2021.05.018.

  •  
  •  

0

Views

28

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Fast Calculation Method for Steady Temperature Rise of Buried Cable Group Based on Transfer Matrix
Research on Adaptability Simulation Validation of Transient Temperature Rise Thermal Circuit Model for Buried Cable Group Under Complex Environment
Calculation Program for Additional Loss of HV Converter Transformer Based on Advancing Front Method
Characteristic Analysis and Finite Element Calculation Method for Shell Circulating Current of 252 kV GIS Substation

Related Author

YAO Zhoufei
LI Honglei
ZHU Lingyu
FU Chenzhao
LIANG Yongchun
YANG Jian
SI Wenrong
LI Ting

Related Institution

Xi’an Jiaotong University
Xi'an Jiaotong University
Hebei University of Science and Technology
Hebei University of Technology, School of Control Science and Engineering
Pinggao Group Co., Ltd.
0