WU Shipu, LI Xuan, WANG Benjin, et al. Study on Errors and Its Influencing Factors of Low Power Consumption Instrument Transformer for Primary and Secondary Fusion[J]. High voltageapparatus, 2021, 57(6): 140-151.
DOI:
WU Shipu, LI Xuan, WANG Benjin, et al. Study on Errors and Its Influencing Factors of Low Power Consumption Instrument Transformer for Primary and Secondary Fusion[J]. High voltageapparatus, 2021, 57(6): 140-151. DOI: 10.13296/j.1001-1609.hva.2021.06.019.
Study on Errors and Its Influencing Factors of Low Power Consumption Instrument Transformer for Primary and Secondary Fusion
The reduction of accuracy of low power consumption instrument transformer(LPT)after the miniaturization design has limited its application in the primary and secondary fusion for distribution equipment.For the purpose of finding a way to improve the accuracy of LPT and promote the development of primary and secondary fusion for distribution equipment
the study on the LPT’s error and its influencing factors is carried out in this paper.The test on the influence of such factors as temperature cycle
vibration
EMI and wiring on the errors of low-power consumption instrument transformers is systematically conducted.The variance calculation method is used to analyze the error variation characteristics of the instrument transformer.Under the condition of insufficient samples
the hypothesis testing method is used to verify the analysis of vibration test result by the paper.The electric field models are set up to analyze the influence mechanism of proximity effect and wiring on the error of LPT.The study result reveals that the error of all kinds of LPT under test is within the limit range
showing that the accuracy of LPT fully meets the requirements of the primary and secondary fusion design.With consideration of accuracy factor and in the context of great and frequent variation of temperature
the resistance divider voltage instrument transformer shall be given priority in the primary and secondary design proposal.The influence of vibration on the error of the instrument transformer is very small
even less than the influence of temperature.The low power consumption instrument transformer
in the context of vibration
still has stable and dependable accuracy.In case of magnetic field interference
selection of iron core with wide linear range and unsaturation can still keep LPCT instrument transformer having higher accuracy.While
in case of wiring
selecting optimal HV lead length to keeping the included angle between the HV lead and the horizontal direction at 90°can
in case of wiring
minimize the influence of the HV lead on the error of the instrument transformer.Properly increasing the installation distance of the instrument transformer and adding shielding on the instrument transformer are the effective measures to reduce electric field interference and improve accuracy of the instrument transformer.