您当前的位置:
首页 >
文章列表页 >
Investigation,Technical Analysis and Development Countermeasures of Operating 10 kV American-type Prefabricated Substation in China
更新时间:2025-04-26
    • Investigation,Technical Analysis and Development Countermeasures of Operating 10 kV American-type Prefabricated Substation in China

    • High VoltageApparatus   Vol. 59, Issue 1, Pages: 161-168(2023)
    • DOI:10.13296/j.1001-1609.hva.2023.01.023    

      CLC: TM63
    • Published:2023

    移动端阅览

  • LI Dege, FENG Ying, WANG Chengyu, et al. Investigation,Technical Analysis and Development Countermeasures of Operating 10 kV American-type Prefabricated Substation in China[J]. High voltageapparatus, 2023, 59(1): 161-168. DOI: 10.13296/j.1001-1609.hva.2023.01.023.

  •  
  •  

0

Views

145

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

No data

Related Author

No data

Related Institution

No data
0