Development of Split-step On-load Tap-changer for Converter Transformer
Research & Analysis | 更新时间:2025-04-26
    • Development of Split-step On-load Tap-changer for Converter Transformer

    • High Voltage Apparatus   Vol. 60, Issue 1, Pages: 154-162(2024)
    • DOI:10.13296/j.1001-1609.hva.2024.01.018    

      CLC:
    • Received:03 September 2023,

      Revised:06 December 2023,

      Published:16 January 2024

    移动端阅览

  • LYU Wei, CHEN Yu, SUN Chao, et al. Development of Split-step On-load Tap-changer for Converter Transformer[J]. High voltage apparatus, 2024, 60(1): 154-162. DOI: 10.13296/j.1001-1609.hva.2024.01.018.

  •  
  •  

0

Views

40

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Mechanical Condition Identification of On-load Tap-changer Based on Optimized TQWT and Twin SVM
On-load Tap-changer Field Testing Waveform Analysis of 500 kV Electric Power Autotransformer
Identification of the Operation State of Transformer On-load Tap-changer Based on Timefrequency Characteristic Analysis
Research on Vibration Signal Detection Technology of Converter Transformer’s On-load Tap-changer
Development Status and Prospect of Transformer On-load Tap-changer Technology and Fault Diagnosis

Related Author

YU Changting
ZHAO Jian
ZHANG Lei
CHEN Liangyuan
LI Dajian
HE Jing
WANG Ling
WU Dong-wen

Related Institution

Electric Power Research Institute, Guangxi Power Grid Corporation
Key Laboratory of Control of Power Transmission and Conversion, Shanghai Jiao Tong University, Ministry of Education
Jiangxi Electric Power Co.Extra High Voltage Branch
Henan Senyuan Electric Co., Ltd.
State Grid Jiangsu Electric Power Co.,Ltd.,Research Institute
0