Study on Temperature Field Simulation of Three-core Cable Joint with Installation of Fire-proof and Explosion-proof Box
Research & Analysis|更新时间:2025-04-26
|
Study on Temperature Field Simulation of Three-core Cable Joint with Installation of Fire-proof and Explosion-proof Box
High Voltage ApparatusVol. 60, Issue 11, Pages: 123-130(2024)
作者机构:
国网江苏省电力有限公司电力科学研究院,南京 210000
作者简介:
基金信息:
Science and Technology Project of State Grid Jiangsu Electric Power Co., Ltd. (Research on Fire Monitoring and Early Warning Technology for High and Low Voltage Power Cable Lines Laying in Common Channel)
CHEN Jie, LI Chenying, TAO Fengbo, et al. Study on Temperature Field Simulation of Three-core Cable Joint with Installation of Fire-proof and Explosion-proof Box[J]. High voltage apparatus, 2024, 60(11): 123-130.
DOI:
CHEN Jie, LI Chenying, TAO Fengbo, et al. Study on Temperature Field Simulation of Three-core Cable Joint with Installation of Fire-proof and Explosion-proof Box[J]. High voltage apparatus, 2024, 60(11): 123-130. DOI: 10.13296/j.1001-1609.hva.2024.11.015.
Study on Temperature Field Simulation of Three-core Cable Joint with Installation of Fire-proof and Explosion-proof Box
The cable joint is the part with the highest fault rate in the cable system
the damage due to cable joint fault can be effectively reduced by the explosion-proof box. However
the existence of explosion-proof box will affect the temperature of the cable joint. In this paper
the 3D simplified model of 10 kV three core cable joint and explosion-proof box is set up. The Ansys simulation software is used to simulate the electromagnetic-heat and electromagnetic-heat-fluid two-way coupling of the 3D model to analysis the temperature field distribution at such three cases as no addition of explosion-proof box
addition of of explosion-proof box with sealant as the filler and addition of explosion-proof box without filler. Then
the influence on the peak temperature before and after the addition of the explosion-proof box due to such three factors as air convection heat transfer coefficient
ambient temperature and the thermal conductivity of sealant. The research results show that the temperature of cable joint is increased at two cases after addition of the explosion-proof box for the joint and
in case of no filler in the explosion-proof box
the temperature of the joint is more variable. With the increase of the heat transfer coefficient
the peak temperature difference of the joints before and after adding the explosion-proof box increases gradually. While
the influence of ambient temperature on the variation amplitude of peak temperature can be ignored before and after adding the explosion-proof box. The increase of thermal conductivity of sealant to a certain extent is conductive to the increase of the cable joint current carrying capacity.