您当前的位置:
首页 >
文章列表页 >
Insulation Defect Monitoring of Wide Area Capacitive Equipment Based on Synchronous Timing
Technical Discussion | 更新时间:2025-04-26
    • Insulation Defect Monitoring of Wide Area Capacitive Equipment Based on Synchronous Timing

    • High Voltage Apparatus   Vol. 60, Issue 11, Pages: 234-240(2024)
    • DOI:10.13296/j.1001-1609.hva.2024.11.028    

      CLC:
    • Received:19 May 2024,

      Revised:17 July 2024,

      Published:16 November 2024

    移动端阅览

  • XIE Jia, YANG Haitao, KE Yanguo, et al. Insulation Defect Monitoring of Wide Area Capacitive Equipment Based on Synchronous Timing[J]. High voltage apparatus, 2024, 60(11): 234-240. DOI: 10.13296/j.1001-1609.hva.2024.11.028.

  •  
  •  

0

Views

24

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

PRELIMINARY APPLICATION OF GREY RELATIONAL ANALYSIS TO INSULATION FAULT DIAGNOSIS FOR CAPACITIVE EQUIPMENT
Synthesis Compareison Method Applied in On-line System for Capacitive Equipment
Development of Three-phase Enclosed Insulating Spacer for 126 kV Clean Air GIS
Application of C4-FN Gas Mixture in High Voltage Swtichgear
Influence of Environmental Factors on Insulation Performance of Separable Connector for 12 kV Gas Filling Switchgear Cabinet

Related Author

WANG Nan
LU Fang-cheng
LI He-ming
WANG Xiao-ming1
LI Jun-hao1
MU Lei1
WU Xiao-hui1
LI Yan-ming1

Related Institution

North China Electric Power University
  华北电力大学 河北 保定 071003  
School of Electrical Engineering,Xi’an Jiaotong University
Ultra High Voltage Troansmission Subcompany of Jiangxi Electric Power Corporation,Nangchang
  江西省电力公司超高压分公司  
0