Optimization Design of Ventilation,Heat Dissipation and Airflow Organization for Fully Indoor Modular Substations Based on CFD Simulation
Research & Analysis | 更新时间:2026-04-13
    • Optimization Design of Ventilation,Heat Dissipation and Airflow Organization for Fully Indoor Modular Substations Based on CFD Simulation

    • High Voltage Apparatus   Vol. 62, Issue 1, Pages: 50-59(2026)
    • DOI:10.13296/j.1001-1609.hva.2026.01.007    

      CLC:
    • Received:02 July 2025,

      Revised:2025-10-11,

      Published:16 January 2026

    移动端阅览

  • SHI Hui, CHEN Lei, SUN Yingchun, et al. Optimization Design of Ventilation,Heat Dissipation and Airflow Organization for Fully Indoor Modular Substations Based on CFD Simulation[J]. High Voltage Apparatus, 2026, 62(1): 50-59. DOI: 10.13296/j.1001-1609.hva.2026.01.007.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

13

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Modelling Characteristic Analysis and Layout/Field Testing Scheme for Heat Generation in Electrical Equipment of 110 kV Modular Substation
Optimization Design on Moisture Resistance Property of ZW32 Vacuum Circuit Breaker Based on Insulating Pillar Assembly
Adjustment and Optimization Analysis Method of Opening Time for Circuit Breaker
Efficiency Optimization Analysis of 110 kV Double-break Fast Switch
Optimization of Spring Operating Mechanism for Vacuum Circuit Breaker

Related Author

SHI Hui
SUN Yingchun
TIAN Yanjun
WANG Yilin
LIU Zhijian
SHI Yaxin
LUO Xiang
LIN Yihong

Related Institution

North China Electric Power University(Baoding)
Yangzhou Haochen Electric Power Design Company Limited
Fujian Zhongshisuo Electric Power Testing & Commissioning Co., Ltd.
Enterprise Key Laboratory of Electric Distribution Technology for High Reliable Power Supply of Fujian Province
State Grid Fujian Electric Power Research Institute
0