您当前的位置:
首页 >
文章列表页 >
Simulation Calculation of No-load and Short Arcing Interruption of 550 kV Fast Circuit Breaker
Research & Analysis | 更新时间:2026-07-06
    • Simulation Calculation of No-load and Short Arcing Interruption of 550 kV Fast Circuit Breaker

    • High Voltage Apparatus   Vol. 62, Issue 7, Pages: 78-84,94(2026)
    • DOI:10.13296/j.1001-1609.hva.2026.07.007    

      CLC:
    • Received:21 January 2026,

      Revised:2026-03-29,

      Published:16 July 2026

    移动端阅览

  • LIN Xin, SONG Yu, ZHOU Tao, et al. Simulation Calculation of No-load and Short Arcing Interruption of 550 kV Fast Circuit Breaker[J]. High Voltage Apparatus, 2026, 62(7): 78-84,94. DOI: 10.13296/j.1001-1609.hva.2026.07.007.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

35

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research on Sensing and Temperature Characteristics of Chip Type Optical-Silicon-based Electric Field Sensor Based on Electro-optical Polymer Film
Simulation of Space Charge Characteristics of Epoxy Resin at Different Temperatures
Current-limiting Intelligent Control System for New Fast Circuit Breaker Bypass Reactor
Partial Discharge Characteristics of Void Defect Inside A 126 kV GIS Post Insulator Under AC and DC Voltages
Research on Plasma Repair of Insulation Surface Defects in EPDM Cable Accessories

Related Author

LIU Yang
LIU Jingxuan
LI Haifeng
LIANG Gang
CHEN Ning
RAO Yufei
YANG Qing
WEI Shichao

Related Institution

State Grid Henan Electric Power Research Institute
Henan Nuodun Technology Co., Ltd.
School of Electrical Engineering, Chongqing University
Beijing Key Laboratory of High Voltage & Electromagnetic Compatibility, North China Electric Power University
State key Laboratory of Alternate Electric Power System with Renewable Energy Sources,North China Electric Power University
0